Waste Cell extension

Dunn’s Earthmoving completed a landfill cell extension, including site preparation, excavation, leachate collection system installation, and HDPE liner placement, ensuring environmental compliance and effective waste management through precision engineering and industry-best practices.

Landfill cell extension & protective liner install - Construction Process

  1. Site assessment, preparation & construction
    • Conduct all survey and environmental assessments under the guidelines set out by the client
    • Clear the site
    • Excavate to the required dimensions, depth to ensure spec design is achieved
  2. Leachate Collection system installation
    • Install perforated drainage pipe systems
    • Install included bedding sand and gravel to promote drainage in accordance with design
    • Ensure connections and design standards are achieved to ensure proper leachate drainage
  3. Liner Installation
    • Ensure surface design is achieved to enable liner install to meet design
    • Install HDPE liner in conjunction with installation team provided by supplier
    • Add protection clay layer as per design
PROJECT
Waste Cell extension
CONTRACT TYPE
Fixed
Key Capabilities
  • Build a new landfill cell to support waste requirements
  • Construction of cell to comply with environmental guidelines and client specifications
  • Deliver the project without incident & within the required timeframe 