- Advanced Equipment:
- GPS equipped machinery - Ensures precise application and compaction of the base and top coats.
- Material Expertise:
- Knowledge of selecting the appropriate base materials sourced from within the Cooper Basin, bitumen grade and mix design for specific project requirements.
- Surface Finishing:
- Proficiency in achieving a smooth and even surface with the desired finish in preparation for the two coat seal finish
- Environmental and Safety Standards:
- Adherence to environmental guidelines and safety protocols during handling, transport, and application of materials
Bitumen Resurfacing - Construction Process
- Bonython Road - Moomba main access new seal 1200m
- Bonython Road bitumen repairs, 28 failed areas (pot holes) varying in sizes
- Moomba Main Camp, Southern car park and access road bitumen repair
- Area of failed bitumen 130m x 40m needing base repair and apply two coat seal
- 200m of road including T junction to repair road base and apply two coat seal
Quality Control & traffic management:
The work was completed following industry best practices, with quality checks and testing to ensure the spray seal meets the specified requirements for road longevity and performance.
Effective traffic management plans were in place to ensure minimal disruption to local traffic while maintaining the safety of both road workers and the public during construction
PROJECT
Remote Haul Road - Bitumen Resurfacing
CONTRACT TYPE
Fixed
Key Capabilities
Need to know more about what Dunns can do for you?
Test button